top of page

Domino's - Salisbury MD

Removed the old gravel roof and installed new Mule-Hide TPO Roof.

The old roof was made up of a top layer of gravel and bottom of hot asphalt. We removed the entire roof to the bare deck. A new Mule-Hide 60mil TPO Roof with R-30 insulation was installed..

Manufacturer:

Mule-Hide

System:

60mil TPO Fully Adhered

Project Gallery

OUR CREDENTIALS

LATEST NEWS &
ANNOUNCEMENTS

bottom of page